One Call Now Banner2

Village Christian School

  As one of the school’s biggest projects in 25 years, this three-tiered project included converting an existing gymnasium into a multi-purpose performing arts venue and developing two new facilities: a Performing Arts Annex, including a black box theater, and an Athletic Training Facility. The pavilion included lobby and building façade renovation, as well as

Unity Christian High School

When this project was conceived, the goal was to achieve a thermally efficient, durable, functional and attractive structure that would also provide a high level of safety to the local community. Kerkstra Precast worked with Unity Christian staff with plant visits over many years. They also worked with GMB Architecture and Engineering on design ideas

Gilbert Christian School

Gilbert Christian High School is a two-story, above-ground building with a basement. The enclosed building area totals about 70,400 square feet. The Greek-style architectural facade of the building is mixed with Corinthian accents to create a unique building in the surrounding area. The school is clad with only two components: a custom Arizona thin brick

Grace Christian School

A year and a half after breaking ground, Grace Christian School in Millgrove, Ontario, opened its doors last September – right in time for the new school year. The brand-new school is the result of an amalgamation between Burlington’s John Calvin Christian School and Flamborough’s Covenant Christian School, which was demolished to make way for

Bethany Christian Schools

Goshen, Indiana Sometimes what can’t be seen is as important as what can be seen. In the case of Bethany Christian Schools launching a large-scale improvement project to its facility, roof and mechanicals, the external benefits won’t be nearly as obvious as the long-term savings and the educational opportunities created. Bethany Christian Schools, along with

Central Catholic High School

Portland, Oregon Central Catholic High School’s first wing was built in 1939. Since then, a succession of additions filled out the urban four-block site, and CCHS transformed from a 1,000-male student body to a vibrant 800-student co-ed population. A few years ago, the school challenged Bora Architects to develop a plan to modernize the building

Principia School

Hastings+Chivetta Architects has completed a 29,738-square-foot renovation to the library at Principia School, a pre-K-12 boarding school located in suburban St. Louis, Missouri. The firm served as architect, interior designer, and construction administrator. Hastings+Chivetta has a close partnership with the school, having completed 12 projects on campus in the past 10 years. Within the library

St. John the Baptist Diocesan High School

BBS Architects, Landscape Architects and Engineers has completed the $2.08 million redesign and renovation of the 8,200-square-foot library at St. John the Baptist Diocesan High School in West Islip, New York. BBS served as architect; interior and furniture designer; mechanical, electrical, and plumbing (MEP) engineer; and technology consultant. The scope of construction work included the

Ten Tips on Selecting a Janitorial Cart

A well-organized and properly designed janitorial cart can make the custodian’s job easier, safer, and more effective, while improving productivity. For cleaning contractors and facility managers, improving worker productivity often means work gets done faster and janitorial workers can attend to more cleaning tasks, such as those addressed only if time allows. According to Dennis
Maple Flooring